We're not a commodity panel shop. We're a vertically-integrated build partner with a single set of operating principles, applied to every project — from a single-family home to a 276-unit garden-style community.

/ 01

Integrity &
Transparency.

One number. One schedule. One team accountable. We publish a weekly cadence — modules per week, deliveries per month, expected crane-set dates — and we hit the dates we publish. If we miss, you hear it from us first, with a recovery plan attached.

100%
Weekly cadence published in advance
±3 days
Schedule variance over 2 years
/ 02

Technology
driven.

A digital twin of every module. BIM coordination between architect, structural, and MEP runs in our cloud. Live factory dashboards show exactly where your modules are on the line — visible to your team in real time. Your project is never a black box.

Live
Factory floor dashboard
BIM
End-to-end coordination
/ 03

Quality,
by design.

Climate-controlled production with third-party inspection at every milestone — framing, MEP rough-in, drywall, finish. The work is never rained on. The labor is never rotated mid-task. Tolerances are enforced with industrial measurement, not a string-line.

7-stage
Inspection regime per module
−40%
Punch list items at turnover
/ 04

Experience.

Our team has been building and developing residential housing for a combined 20+ years. We know the process, can save money for the client, and ask the right questions up front to get the best solution for our customer.

20+ yrs
Combined team experience
Up front
Right questions, best solution
/ 05

Speed to
move-in.

Every decision we make is measured against one metric: the day a resident gets the keys. Factory production runs in parallel with site work, compressing the critical path. The result is a predictable, faster path from groundbreak to certificate of occupancy.

Up to 2×
Faster than traditional construction
−90 days
Average schedule compression
Stick-built vs. modular / 02

A side-by-side, plainly stated.

There's no marketing spin here — just a row-by-row comparison of how a stick-built project runs vs. a ModMax-delivered one.

Dimension
Stick-Built
ModMax Modular
Schedule certainty
±30–60 days typical
±3 days over 24 months
Weather exposure
Fully exposed during framing
Climate-controlled factory
Critical path
Sequential trades on site
Factory + site run in parallel
Inspection
Field-by-field, weather-permitting
7-stage in-factory + on-site
Labor risk
Trade availability per market
Stable factory workforce
Punch list at turnover
200+ items typical (200-unit MF)
60% reduction observed